HomeHelp and adviceHome improvements

Connecting to a sewer

小牛加速器免费试用-快连加速器app

If you're planning to connect or reconnect to one of our sewers, you’ll need our consent before you go ahead. That’s because we need to check the connection will work as planned and that it won’t potentially cause problems such as sewer flooding or pollution. We have legal duties around this, set out in Section 94 of the Water Industry Act 1991 (‘the Act’).

Sewer connections can be made directly to a public sewer or indirectly to a private drain that in turn discharges to a public sewer. Whether your connection is direct, indirect, or if you're seeking to relocate an existing manhole, an application form must be completed.

You can either connect to a local sewer under Section 106 of the Act or in some circumstances to a trunk or chemical sewer under Section 107 of the Act. Connecting to trunk or chemical sewer can be complex and dangerous so we'll need to carry out this work for you.

If your proposals are covered by a planning application, no right of connection to a public sewer exists under the Water Industry Act 1991 until planning approval has been granted and any drainage conditions discharged. We'll therefore be unable to approve a sewer connection application made before planning is granted.

小牛加速器免费试用-快连加速器app

小牛加速器免费试用-快连加速器app

easylink加速器官网,easylink加速器电脑版下载,easylink加速器免费试用,easylink加速器打不开了  米丝云下载地址,米丝云ios下载,米丝云电脑版下载,米丝云vpm  唐师傅加速器官网,唐师傅加速器npv,唐师傅加速器vpm,唐师傅加速器vqn  小哈vp加速器破解版,小哈vp加速器7天试用,小哈vp加速器用不了了,小哈vp加速器2024年  彗星加速器下载地址,彗星加速器安卓下载,彗星加速器vqn,彗星加速器不能用了  proton加速器官网,proton加速器下载地址,proton加速器pc版下载,proton加速器vps  云梯加速器安卓下载,云梯加速器vqn,云梯加速器2024,云梯加速器2024年  安卓软件,安卓加速软件,安卓加速器,每天两小时免费vpn